Chapter 91

59 2 0
                                    

Pierre had already taken over the design of the city from Felix. Although Felix had to re-investigate the site because Felix changed the original city area, it was generally smooth.

And so far, he is still trying to build a sewer system. In the urban design drawing of the new city, he only draws some lines to represent the route of the sewer and intends to use these lines to circle various areas that a city should have, such as the City Lord's Mansion. , commercial area, residential area, etc., but he did not draw any specific content.

So when Felix called him, the architect started by talking about the sewer system he was working on recently.

"After the model was made, we carried out many tests to rule out the possibility of sewer blockage and overflow caused by hiding. After adding and deleting some parts, according to this model, we can refine the route of the sewer on its basis. "

The sewer system that Pierre has been working on recently is not just a drawing and design drawing on paper. He got a point when discussing with Wei Wei before. After surveying the terrain, he made a ground model after scaling down according to the actual terrain. Looking for a potter to burn a lot of miniature pottery pipes, I patched up a sewer system on this model, and I crouched there every day to play with water and I was going to go crazy. I thought that the little old man suddenly became stupid after being stimulated.

Of course, this sewer system is only a rough roadmap. When the urban design drawing is drawn, the sewer system will be refined and extended to each household, so the subsequent model will become more complicated than it is now, and he cannot completely guarantee that there will be no new ones at all. Problems will occur.

But as a brand new attempt, Pierre still has great confidence in his research results.

Of course, this has to be determined that the city will plan according to this set of sewer roadmaps. If even the basic plan is changed, the sewer system will naturally have to be rebuilt.

Seeing that the sewer system is working normally on the model and is ready for use, Pierre will of course inform the employer that he can carry out the next design, and by the way, he will make sure that he will not ask him to re-modify the layout of the new city.

So even if Felix didn't summon him, Pierre would ask for an interview.

Felix didn't mean to modify the basic layout. In general, he was very satisfied with the simple drawing that only had a few lines and then marked the area names with text, because Pierre was very able to grasp Wei Wei's preferences. He arranged these lines representing the sewers combined with the actual terrain to be close to square, and the roads in the city built on this basis can be said to be not complicated at all.

And since Wei Wei planned the slave's house neatly and orderly, she knew her preference in this regard.

And as long as Wei Wei likes it, Felix won't have much dissatisfaction.

In particular, Pierre also told him: "After the design is drawn, you can make it on the model to see the actual effect, and if you are not satisfied with it, you can also modify it."

This is much more convenient than half of the repairs where the employer suddenly feels that something is not good and asks for a design change. Pierre has often encountered this kind of thing before. Now he can build a model in advance, and if he is dissatisfied, he can directly change it to his satisfaction and then start the construction.

So this time, he mainly wanted to ask Felix what style of urban architecture he wanted, and if there were any special buildings that he needed to add.

Of course, there is, and it's important.

Lady of the Lord From the EastWhere stories live. Discover now