Name: USS Ticonderoga
Class: 2nd Enterprise Class Carriers Final Version 2
Ship Looks:
Shipgirl Looks:
(Instead of her right arm being robotic it's her left arm instead)
Height: Nearly 250 ft
Decks: 25
Designation: CVN-82 (JFK, Enterprise CVN-80, Doris Miller were built next year between 1 month. fast ik. Also CVN-65 was not scrapped as it lasted 1 and a half year longer before it was scrapped and the invasion of the sirens.)
Commissioned: 2018
Laid down: 1958 with the other ships but were cancelled except 3 ships.
Weight 110,000 Metric tons (Full Load)
Defense:
3x 20mm Phalanx CIWS Block 1B
2x RIM-116 Rolling Airframe Missile (RAM)
2x RIM-162 Evolved Sea Sparrow Missile
Propulsion: 2x A1B reactors
Speed: 33.6km
Aircraft:
F/A-18F Super Hornet Double Seater
F/A-18E Super Hornet Single Seater
MH-60S Seahawk
V-22 Osprey
AH-1Z Viper
AH-64E Apache
2x F-14D Tomcat
2x E-2 Hawkeye
1x F-22S (Specifically made for carrier operations)
Backstory: Built in 2019 after the rest of the Gerald R. Ford ships were rushed after the siren invasion in November 2018. July 4th 2019, People were celebrating Independence Day so most port crew was not here meaning security was not tight meaning a siren snuck on board and rigged it blow like the explosion like on CVN-65 causing Ticonderoga to lost her left arm instead of her right like CVN-65. It was soon fixed and her arm was replaced with a robotic arm.
=========================================================
I'm pausing Last Pilot of Azur Lane (fanfic) because I'm not fully ready for a reader insert yet.
YOU ARE READING
The 2nd Enterprise Class Carrier to Azur Lane
Historical FictionUSS Ticonderoga was built in 2018 after Gerald R. Ford was commissioned in July 22, 2017 and the invasion of the Sirens in November. July 4th in 2019 outside New York City, the sirens sabotaged a rocket and just like CVN-65 it was a disaster heavily...